Prototype — not an official Entergy product. Sample data for demonstration only.
Energized Work Plan · AI Review

New Energized Work Plan

Start a plan:

Upload your EWP file (PDF or text) — the AI reads it and fills the fields below. If the file isn’t an EWP, we’ll let you know.

Or paste the text instead

Fields marked * are required.

Project Information

kV

Picking a listed framing pre-fills the step-by-step work plan below.

Job description and project overview (framing, wire size, equipment, accessibility as relevant).

Customer impact / outage duration if not allowed to work energized.

Specific electrical hazards for this job; verify adjacent facilities allow safe transfer of conductors.

Actions taken to minimize the amount of energized work in this project.

Cover-up installation → conductor handling → cover removal. Pick the crew member and describe each action.

No steps yet — add cover-up, conductor-handling, and cover-removal steps one line at a time.

6. Personnel that will be assigned to perform work *

Names may be left “TBD” at submission — crews must be added before work begins.

Attachments

Upload field photos, switching orders, circuit prints, etc. (up to 25 MB each).