Level 4 Energized Work Plan

Fill this out on site, have every crew member sign, and download the PDF — that PDF is your on-site Level 4 EWP form. Fields marked are required.

Job information

Has the condition of the adjacent structures been inspected to allow safe operations?
Have the automatic sleeves in the work area been mitigated?

EWP Steps

All steps should be worked in sequential order and circled/slashed on the printed form for place keeping.

Draft steps with AI

The AI drafts the playscript steps from the work you described above, in about a minute. Review and adjust them — and if you want a second set of eyes, run “Check steps with AI” below.

Fill in “Describe Work being Performed” up in Job information first — that’s what the AI drafts from.

Crew performing this task

Lineman
0
Foreman
0
GF
0
Groundman
0
Operator
0

No steps yet — add cover-up, conductor-handling, and cover-removal steps one line at a time.

Personnel that will be assigned to perform work

Tick Designated Observer for the qualified crew member watching the energized work.

Approval and Authority to Proceed

The above has been reviewed. We approve the project as described above, and authorize the team to proceed. All crew members to sign EWP.

Type the crew member's name to open the signature pad.